Billings 25.3 Release Notes

General release is available starting 21-APR-2025.

Updated 21-APR-2025

  • New Manual Rate Import wizard – The Manual Rate Import wizard is a new feature under the processes menu that lets you import labor, equipment, material or line Item rates from a spreadsheet. Template spreadsheets are provided when accessing the wizard, but any Microsoft Excel spreadsheet can be used and mapped through the wizard process. ClosedRead more

    For more information, see Manual Rate Imports.



  • InEight Plan signatures integration – When the Project setting for Progress is set to Require client sign-out, the client’s signature added via the Sign in/Sign out tab in a daily plan now shows as a report in the Attachments tab in the corresponding Billings time sheet.

  • InEight Plan Notes integration – Notes included in a daily plan now show in the Notes tab in the corresponding Billings time sheet.