1. Click the Add scope item icon in the upper left. The Add scope item dialog box opens.

  2. Fill out the following required fields and any optional fields:

    • Description

    • Claiming scheme

    • Scope item UoM

  3. Click Add. The Update scope item qty dialog box opens.

  4. Select a cause code from the Cause code drop-down list, and then optionally enter a note.

    When integrated with InEight Change, you can optionally select the Associate to change issue check box, and then select an issue from the grid.

  5. Click Update.