An alternative to defining review teams using the tabulated interface, define and/or edit review teams using a graphical user interface or Visual Designer.
From within the Review Team Tab, click on the Visual Designer link at bottom of the screen. If a review team has already been defined it will be displayed graphically.
To add new reviewers click and drag from the notes to the right or left of each existing reviewer box (if any) to draw new connecting lines. If a connecting line is drawn into an empty area it is assume that a new reviewer is to be added and the new reviewer window will appear where the reviewer details can be entered.
To edit an existing reviewer double click on the reviewer in the designer and edit details.
Use the buttons at the bottom of the designer window for Add Reviewer; Add Parallel Connector; and Validate connections. The Add Parallel Connector button is used when it is required to have more than one set of reviews in parallel directly following each other within the same workflow.