Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
To adjust your logo:
Within the Companies detail select Customize Logo from the Upload Logo drop down list.
Edit the pixel settings which control the logo size (height and width).
Choose the required position for the logo from Top Right, Top Middle or Top Left.
Use the preview area button to see how your logo will appear on mail.
The preview will show you the position of the logo on a default mail template, not your custom mail template.
The logo file formats supported are GIF, JPEG / JPG / JPE, PNG, BMP.
Use the Remove Logo selection from the Upload Logo drop down list to remove an uploaded logo. This is required if you want to replace your company logo with a new file.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information