Data can be imported into InEight Document Configuration tables from Excel.
To Import Configuration Tables from MS Excel:
From Admin, select Configuration Tables.
From More select Import Configuration Data From Excel Sheet.
Click Download Template to download the Excel template.
Populate and save the template with the data to import.
Click Import Template, select the Import file populated and Open.
The rows on the Import Bulk Configuration Data window will populate automatically based on the information in the import file.
Click Validate and fix any errors. Click Save when done.
A verification of upload message will be received.
The template will contain a separate sheet for each Configuration table.
Each sheet that has data will be imported.