Revisions are a mandatory attribute of controlled documents in InEight Document. There is a strict rule in InEight Document that each time a document is uploaded, the revision number must be greater than the previous revision. This is controlled via a sequence number against each revision.
The Sequence is used to validate documents being uploaded to ensure that the revision being uploaded is greater than the previously uploaded revision.
From the Configuration tables select Revisions.
Click New.
Revision are populate with the following fields:
Add any remarks (optional).
Click Save.
It is possible to upload additional view files to a document without changing the revision.
When populating the sequence field, leave plenty of gaps in the sequences used so additional entries can be added in the sequence.
Additional Information