Connecting to an InEight Document Project 

  1. Click the drop down option from the top left toolbar in Bluebeam and select a project.

  1. If this dropdown is not available, right click on the toolbar and select Document Management.

  1. Click the power plug icon next the dropdown to connect.  Using single sign on (if enabled) will connect the user and provide them with an alternate icon (both plugs joined together and a green circle) which indicates the user is connected to the project.