When specifying section items, the following details must be provided:
Item sequence – defines the order in which items appear within that section.
Item number – the item number which will be displayed on the Checklist.
Description – details of the item to be completed.
Tooltip – text to appear when mousing over the Checklist item.
Response Type – how the recipient (For Action) must complete their response e.g. single line of text, checkbox or date field. See detailed descriptions.
Mandatory – whether that item is mandatory within the Checklist.
If the Response Type is set to Text, you can select Configure to set the Text Input Type to be alpha and/or numeric characters, or any character.
Added the above note (19.11 update).
The following Checklist Response Types are available:
Text: Allows a single line of text to be typed.
Date: Text box in format of dd-mm-yy and a date picker.
Date Time:Text box in format of dd-mm-yy, a date picker and time selection.
Added the above 19.11 update for Date Time.
Checkbox: A single checkbox to be ticked.
Label: Free text used to provide information that does not require a direct response.
Attach File: Allows supporting file(s) to be attached.
Text Area: Allows multiple lines of free text to be typed.
Yes/No: A dropdown box with the option to select “Yes”, “No” or “N/A”.
Checkbox Group: Allows a user defined list of checkboxes which can be ticked individually.
Dropdown List: Allows a dropdown list of Administrator defined options.
Configuration Table: Allows a dropdown list selection from an existing InEight Document Configuration Table.
Address Book: Allows the selection of a Company and subsequent Contact.
TeamBinder Action: Allows TeamBinder Actions (Only Forms at this stage) to be raised from the checklist and linked (see "Creating a Form from a Checklist")
Signature: Allows for a signature control field to be added which can also be signed on the mobile app.
Additional Information