Participating in a Checklist

  1. Click on the Checklist Module to open the Checklist Register.

  1. Double click on the Checklist that needs an action completed.

  2. Complete the items as required in each section. The items may have different associated response types such as free text, checkbox, dates etc.

  3. Click Complete to notify the system that you have completed the relevant Sections and move the Checklist onto the Verifier.

Click Save to save progress on the Checklist. It can then be edited at a later time as required.