Once all Checklist Sections have been completed, the Checklist will need to be checked by the Verifier, (as defined when the Checklist was first issued).
To verify a Checklist:
Double-click the Checklist from the Checklist register.
Locate the Verification section of the Checklist.
Select whether the Checklist has passed or failed.
Add any required comments.