Verifying a Checklist

Once all Checklist Sections have been completed, the Checklist will need to be checked by the Verifier, (as defined when the Checklist was first issued).

To verify a Checklist:

  1. Double-click the Checklist from the Checklist register.

  2. Locate the Verification section of the Checklist.

  3. Select whether the Checklist has passed or failed.

  4. Add any required comments.