Adding a drawing to an Inspection List item allows the defect inspector to further clarify the exact location of the defect. For example, a floor plan may be added as an Inspection List drawing. When capturing the defect location, pins can be placed on the drawing to pinpoint where the defect is located, in relation to the floorplan.
Right click on an Inspection List item and select New or Edit.
Select the Attach Drawing button, you will then be prompted to select a file to upload to the Inspection List item.
Select OK to save your changes.