Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
The ‘Details’ report provides an overview of all registered defects for the project.
Images, map location and drawings can be included in the Details report. If the map location is included, it will show the defect’s GPS coordinates captured when defects are created on a mobile device. Coordinates can be displayed in Google Maps or alternative mapping systems. Drawings will be printed at the end of the report.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information