Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
Should any changes need to be made to any item within the Inspection List, this can be achieved following the steps below.
Within the Project Inspection List, select the item that is to be edited and right-click on it. This will display a number of options.
From the selection, click Edit.
This will open the Edit screen where the current details will be displayed and editable. The only field that cannot be edited is the parent item (Location in the example below).
Once the changes are made, click OK. The changes will then be applied to the Inspection List item.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information