Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
Selecting Import Template downloads an Excel spreadsheet to the user’s local computer. This spreadsheet contains several fields and examples to assist in uploading another Inspection Lists’ output into the Defects module.
The Import Template can also be used to upload Defects to the Defect Register in bulk. This can be done by filling the template with existing items from the Project Inspection List and populating the inspection details, inspection date, and defect to be captured.
The Import Template also allows you to assign a responsible company and due date when capturing defects.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information