There may be a time where a Sub Contractor or Inspector is unable to complete the defect, in this case administrators can ‘re-assign’ the defect to another Sub Contractor or Inspector.
The Sub Contractor/Inspector that is assigned to a defect can be replaced by another Sub Contractor/Inspector as follows:
Select More then Replace Sub Contractor or Replace Inspector from the Defects Register.
Confirm the change is required when prompted.
The Sub Contractor or Inspector will be removed and the new Sub Contractor or Inspector will be added.
Additional Information