Summary – By Contractor, By Area report

The ‘Details – By Contractor, By Area’ report provides a summary of the registered defects, grouping them by the assigned Sub Contractor and the number of Total/Claimed/Completed/ Outstanding Defects by Area (as defined in the Project Inspection List).