Generating a Document Hyperlink

A hyperlink to the document can be sent to another user that will take them directly to the document.

To generate a document hyperlink:

  1. Locate and select the Document in the Document Register.

  2. Click More then select Generate Document Hyperlink.

  3. At the generate document hyperlink window, select Copy to Clipboard.

  4. Paste the hyperlink to the required location.

  5. Click the Close button.

  • The recipient of the hyperlink must already have access to the document.

  • The recipient of the link will be prompted for their login details if they do not already have an open session of InEight Document.