Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2024 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
This article outlines a 2-step workaround for uploading large file attachments (greater than 10 GB) to the InEight Document module using 7-Zip to split files into smaller parts.
Have access to the InEight Document module.
Have permission to create new documents and attach files.
Have the 7-Zip application installed on your computer.
Open the folder containing the large files you want to upload.
Right-click the folder, and then select 7-Zip > Add to archive. (if using windows 11 you may need to click Show more options to find the 7-zip menu). The Add to Archive dialog opens.
Click the ellipsis button to choose the destination folder for the split files.
In the Split to volumes, bytes field, select a size for each file from the drop-down list. 10000m equals a 10gigabyte file size and should be the maximum value selected.
Adjust other settings as needed (for example, archive format, compression level).
In the Documents module, select New, and then complete the required fields.
Click the drop-down arrow next to the Attach Files button, and then select the Attach Large Files (> 2GB) option.
Select the first batch of split files (for example, .001 to .005), and then click Open.
After the files are uploaded, click Save to save the document and attached files. Ensure all split files are uploaded to the same document revision.
Open the document revision containing the uploaded files.
Click Download All to download the files as a ZIP archive. (Due to the size of the ZIP file, this may take a while to download)
Right-click the ZIP file, and then select Extract All to extract the contents into a folder.
Right-click the .001 file, and then select 7-Zip > Open Archive.
In the 7-Zip window, click Extract.
Choose a destination folder and ensure there is enough disk space.
Click OK to begin extraction.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2024 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information