Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2024 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
Documents you have access to can either be downloaded or viewed online using TeamView. TeamView is a web-based application that renders the document via your browser and can also be used to mark-up documents.
There are two versions of TeamView, one based on Active X technology and the second based on HTML5. The version of TeamView suitable for your browser will be loaded automatically. The icons and their explanations below are based on the Active X version of TeamView.
To view a document:
Locate the document in the Document Register.
The Document image will be displayed in a new browser window, rendered by TeamView. The Active X interface is as shown here:
This image below shows the HTML 5 (Chrome) interface.
The icons on the horizontal toolbar have the following meanings:
|
Icon |
Purpose |
|---|---|
|
|
Print: Used to print a copy of the document/drawing. Options include: the page or portions of the page to print; the print scale; margins and number of copies; application of watermarks and headers/footers, and the selection of a pen table if available. |
|
|
Vector Control: Active only for Vector format Documents |
|
|
Rotation: Used to rotate the image by 0, 90, 180 or 270 degrees. |
|
|
Zoom window: Click and then drag a window on the image to zoom into. |
|
|
Zoom options: Zoom 1:1 (zoom to scale); Zoom All (show complete image on screen); Zoom Width (show full width), Zoom Height (show full height). |
|
|
Increase Zoom: Click to increase the zoom. |
|
|
Decrease Zoom: Click to decrease the zoom. |
|
|
Pan Hand: Click and drag in the direction required to move around a large drawing. |
|
|
Birds Eye View: Click to load a birds eye view window. As you zoom in and move around a drawing the birds eye view enables you to keep track of where you are. It is also possible to navigate the drawing by using the small red line outline within the Birds Eye view. |
|
|
Measure: Use the down arrow to measure a straight line distance on the drawing. Click the ruler to define an area by clicking on a start point, drag to the next point, click and drag to further points and then right click to get the measurement statistics which include: Angles, distances of each straight line and the area. |
|
|
Page Down: Enabled on a multi-page document to move between pages. |
|
|
Page Up: Enabled on a multi-page document to move between pages. |
|
|
Select the Page to View |
Use the three options at the top of the screen to switch between:
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2024 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information