When creating a new form, it is possible to control the visibility of Steps by restricting the viewing of a step to only the form initiator and reviewers. As with None level section access, the history of the specific Form section will not be visible to any user with None set as their access.
This feature also applies at a Form Type level so that visibility can be defined at a form type level and then new forms of this type will inherit this setting (with the provision for the Initiator to change it if required).
From within the Forms register, select Configure Form Workflow form the More button and then click the Add/Edit link in the Workflow column against the required form type. Then click the Configure link against the required step to load the above screen.
Additional Information