Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2024 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information

Forms can be exported in Bulk by selecting the Export button after ticking the forms required for export. The following can be exported:
Excel Exports - If the Form Type drop down list is set as All Items then the complete Forms register is exported with all visible columns on screen.
If a specific Form type has been selected in the Form Selector dropdown on the register, then then Export process exports the Section Data into Excel. Note that only one Form Type at a time can be exported in this manner.
Selected Forms – If Specific Forms are to be exported in bulk with their tick only the Forms required and then Export the data to PDF or HTML. PDF Complete exports a zip file containing a folder per Form Exported with all contents as per 9.1
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2024 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information