Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
To edit image metadata:
Double click on the image in the Register view. This opens the Details screen.
Within the Details screen you can edit image details as well as specify tags and any notes associated with the image.
Every user can provide their individual rating for the image by selecting the number of stars and the average rating is populated below the image in the details screen.
An address can also be entered manually. The location will then appear on the map within the Details screen.
Once the Details tab has been completed, click the Save button.
The image number, file size, file type and file name will be displayed under the image.
A single image can be downloaded from the detail view once this tab has been saved.
If an image is taken with the location services enabled on the device against the InEight Document application, the coordinates will be shown on the map automatically.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information