Linking Project Gallery with Other Modules

To link an item from another module with a Project Gallery image:

  1. From the Image Details window click the More button and select Link Items.

  1. Click the Add button and then select the relevant module.

  1. Find the appropriate item(s), tick the required check boxes and click OK.

Linked items will be visible against the image in the Links tab in separate sections by Module.