Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
Within the register users have the option to toggle between a list view and a thumbnail view of the available images using the View dropdown in the top right corner.
When you select Thumbnail View, small thumbnail images will appear.
Using the Sort By drop down you are able to select between the dates, company, tags or location view.
If the List View option is selected from the view dropdown, small thumbnail images with Metadata details will be shown as a list.
Sorting can be done by clicking on the column headers.
Single or multiple photos can be selected for download by ticking the check boxes below every image.
When you select Map View, the register will appear as a map with numerical values placed at locations where images are registered.
Zooming closer to a specific location will split the numerical values to the registered image location.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information