Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
Using the iOS App, toggle between List and Thumbnail View using the icon on the top right corner (next to the tag icon)
The Thumbnail View provides a preview of the images currently saved.
The List View includes a smaller thumbnail along with the basic image Metadata
The Global Map view uses location pins to indicate where images are located.
To download individual images, click the Download icon next to each image. This will download the image to the Downloads area of the App. Images can then be transferred to other applications such as image editors or file managers such as Dropbox.
To download multiple selected images at the same time, use the download icon at the top right corner of the screen. The download icon turns green for images already downloaded and grey if images have not been downloaded to the device.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information