Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
The security controls can be further refined from the Security Group access settings.
Choose the Security tab then select the Project Gallery drop down on the top right hand side.
The following list of security attributes can be configured:
Upload Picture/Video
Upload
Add New Version
Edit Attributes
Edit Details
Add Tags
Add Comments
Link
Link Mail
Link Documents/Transmittals
Link Packages
Link Project Gallery
Other
Module Attachment
Mail Attach
Document ViewFile
Transmittal Attach
Assign projects
Delete Picture/Video
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information