Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
When uploading files, if there is an image with the same name and size that already exists in the Project Gallery register it will be detected by the system.
The user is notified and given the option to not upload the duplicate image.
If the ‘Yes’ option is selected from the duplicate detection pop up notification, the upload will continue and the duplicate image is uploaded. If ‘No’ is selected, an alternative image can be selected.
The following detection criteria are used to identify duplications:
File Name
File Size
Uploading user
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information