Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
The Search tool in InEight Document enable users to search for mail, documents, transmittals, packages and/or other items across all InEight Document modules based on a text string.
Select the Project to search within (defaults to the current project).
Enter a text string in the Search for field.
Click the Search button.
The search results are displayed in the lower half of the screen.
The Global Search defaults to searching though the Title/Subject of the documents in the selected modules. To search all fields (all metadata), click the All option to the right of the caption Search Fields.
To control which modules of InEight Document are included in the search, use the tick boxes to the right of the Search in option.
To further condition the search within each module use the Advanced option
The search can be made case sensitive if required.
The search can be made across all Projects that a user has access to by selecting the All Projects option.
Any work items found can be opened for more detail by clicking on them.
The search results can be printed using the Print button.
If searching the Address book, the All option to the right of the caption Search Fields must be used.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information