Features and Benefits of InEight Document Lots Module

Features

Benefits

Create and open Lots and Sub-Lots within a project- specific Lot structure.

Easily find and access all documents related to a Lot in one place.

Link RFI’s, ITP’s, Test Plans, Hold Points, Witness Points and NCR’s to Lots.

Maintain a fully auditable history of all activities related to Lots and Sub Lots.

Add supporting documents to Lots such as completed inspection checklists.

Quickly navigate and access documents using a custom Lot structure.

Update Lot status, capture Lot details and define and control management responsibilities for each lot.

Easily monitor project progress, activities and responsibilities using project Lots.

Summary and detailed Lot Management reports.

Powerfully filtering allows the dynamic sorting and grouping of Lots with ease.

Manage Security at a granular level and define Lot Status workflow.

Ensure field processes around the Lot’s lifecycle are being reflected in the system.