To create your first Lot:
Select Lots from the left hand menu.
Click on the New button from the register and select Lot.
Within the Details tab, complete Lot details, then click the Save button.
Certain dropdown fields can be made mandatory through the configuration tables. The red asterisks denote the mandatory fields within the Lot details screen.