Lot Reports

InEight Document provides Lot Management reports to allow reporting across Lot activities, Lot closures etc.

To run a report on a Lot:

  1. Select the Reports section of InEight Document.

  1. Click Lots to expand the Lot group of reports.

  2. Select the required report and enter filter criteria e.g. Lot Number, Process, Sub Process etc.

  3. For a detailed report, InEight Document will generate a report listing the items and their current status for each item, within the Lot.

Use the online Help accessed via the Help button at the Dashboard, to find out more about scheduling reports and printing reports to an Excel, PDF and Word document.

Relevant Links