Lot status is managed from the Details tab of the relevant Lot. To update the status:
The Lot Status is displayed in the Lot register via the “Lot Status” column.
User may be prompted with a message when attempting to change the “Lot Status”, to closed out as below if all items stored within the Lot are not closed out.
Additional Information