Sub Lots are typically used to break larger Lots further into smaller sub segments.
For example, a Bridge that is a Lot may be broken into smaller Sub Lots such as Piers, Abutments, Decks and Girders.
There is no limit to the number of Sub Lots that can be created under a Parent Lot.
From the Lot list, select the Parent Lot then select using the New button above the Details tab select Sub Lot.
Complete the new Sub Lot details and click the Save button.