To access Options, from the Dashboard, select Options by scrolling left from the base menu.
|
Options Area |
Description |
|---|---|
|
Clear Files |
Deletes downloaded files and clears all offline data. |
|
About InEight Document |
Provides version app details. |
|
User Preferences |
Option to adjust the maximum number of records to be downloaded and shows the time and date of last download. |
|
Download Offline Data |
Option to turn on ability to download offline data over Mobile Data Network (instead of Wi-Fi). Not active by default. |
|
Maximum File Storage |
Update to set maximum file storage limit on device (MB). |
|
Used (MB) |
Total device storage currently used |
|
Upload Offline Data |
Select Upload to upload data created offline into InEight Document (once an internet connection is available). |
|
Open View Files |
Turning on this feature enables users to open view files directly when selecting documents from the register. |