There are now three main areas to the InEight Document Mobile App Dashboard as shown below, the top menu, base menu and the widget area. Navigate between each area by tapping on the icons.
|
Dashboard Area |
Description |
|---|---|
|
Top Menu |
Menu options at the top of the Dashboard include:
|
|
Base Menu |
Use to navigate between the Dashboard and all available modules. Scroll left to see additional modules as well as Contacts, Options and the Logout option. |
|
Widget Area |
Displays key project statistics grouped by module with links to the relevant data. Some of the key groups are:
Each widget area can be expanded or minimised using the top right arrow symbol in the widget header. |
If you are using an iPad, the screen more closely resembles the standard InEight Document view, with the modules presented in the left hand menu.
Additional Information