Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2024 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information

From the Document register, you can right-click a Word file and select Check Out and Open Document.
Click OK when prompted with the download path.
The document will then become Checked Out and open in Microsoft Word.
Once you have made changes in Word, the file can be uploaded back into the register through the existing Office Integration.
In Word, from the TeamBinder tab, select Upload. The standard upload screen appears with the updated file metadata.
Click Save. This will check-in the previous revision/version and upload the new revision/version. Click Close to exit this screen.
This feature is compatible with Internet Explorer.
This feature requires access to the existing Office Integration tool.
Office Integration must be enabled on the Project. Please contact InEight Document Support to enable this.
To use this feature for Google Chrome you will need to install a 3rd party application called click once.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2024 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information