The following settings can be adjusted from this tab:
Disable Expect: 100-continue headers – Enable this option to fix connection issues between InEight Document Outlook Integration and the InEight Document server caused by the 100-expect-continue and keep-alive headers.
Mark as Unread all downloaded mails – All downloaded unregistered mails will be marked as unread when enabled.
Sync Changes to downloaded mails – if this is not enabled the status changes within InEight Document to previously downloaded mails will not be updated in Outlook.
Sync Response required by date from InEight Document – If ticked this will enable the “Response Required By” date in Outlook. (This is ticked by default).
Do not download mail or transmittal attachments – Does not download any attachments in Outlook.
Download mail or transmittal attachments equal or less than (KB) – Will only download attachments equal or less than a specified size.
Use Default Browser to Open InEight Document Items – When setting is enabled, and an internet connection is available, items opened in InEight Document (by using “Open in InEight Document” button) will be opened as a new window/tab in the user’s default browser.