When running any of the reports below, listed mail items are always subject to the security settings of the user running the report (both in term of mails types and whether (they have access to Company, Department, or Personal Mail).
|
Report No. |
Title |
Description |
|---|---|---|
|
001 |
Inbox – Summary |
This report is based on a summary register of mail in the Inbox. Duplicate mail items will be excluded from the report if this setting has been applied to the user’s Inbox prior to running the report. |
|
004 |
Inbox – Details |
A detailed register of incoming mail that includes the details of responses (linked mails) made to each mail by users within the same company as the logged in user. |
|
005 |
Cross Company Mail Status Report |
This report can only be used if the recipient of mail has the “Allow the sender to see the status of the mail in my inbox” option ticked in their user preferences. If this option is ticked then this report provides visibility into the status of recipients for the sender running the report. |
|
010 |
Sent Items – Summary |
This report is based on a summary register of mail in the Sent Items mailbox. |
|
015 |
Sent Items – Details |
This report shows mail in the Sent Items Mail box with options to include:
|
|
020 |
Mail Review Report – Summary |
This report shows mail sent for review with details on when it was sent, reviewer(s),the review status, and any comments. |
|
025 |
Mail Review Report - Details |
This report is as per report 020 with some additional details provided for each mail item. |
|
060 |
Drafts – Summary |
This report is based on a summary register of mail in the Drafts mailbox. |
|
065 |
Drafts – Details |
This report is as per report 060 with some additional details provided for each mail item. |
|
|
Deleted Mail Items – Summary |
This report is based on a summary register of mail in the Deleted Items mailbox. |
|
085 |
Deleted Mail Items - Details |
This report is as per report 080 with some additional details provided for each mail item. |
|
090 |
Unregistered Mail Items – Summary |
This report displays details of all unregistered mail items and their processed status (one row per item) subject to the search criteria selected. |
|
120 |
Mail Thread Report |
This report displays any mail associated with a thread. Both the root mail of the thread and all the linked mails together with the status of each mail and the thread status are listed. |
|
130 |
Latest Response Report |
This report displays both the root mail of the thread and last reply mail of the thread. |
|
140 |
Mandatory Recipients – Detail |
This report displays the users assigned as Mandatory Recipients in the To and Cc fields. |
|
G001 |
Graphical Report |
The Graphical Report option allows a variety of graphical based reports to be generate based on either the Inbox or Sent Items. For example, the number of mail items by type received on a periodic basis. |