Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2024 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information

At the New Standard Package window, enter the details of the package ensuring that all the mandatory fields marked with a red asterisk (*) are populated.
The fields at the package details window are:
Field |
Description |
---|---|
Package ID* |
Package identifier. |
Package Title* |
Package Title. |
Trade |
The Trade the Package relates to. |
Reason for Issue |
The Reason for Issuing the Package from the drop down selection. If OTHER is selected, then the Reason must be entered manually. |
Approximate Value |
Approximate value of the package (optional) |
Preferred Format |
Preferred file format for documents. |
Long Title |
A long title for the package |
Details |
Any further details |
* Means the field is mandatory.
Click Save then Close.
Packages with similar details can be duplicated by selecting the package then from More select Duplicate.
Packages can be created from the Documents Register by selecting the documents to be included then from Transmit, select Create Standard Package.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2024 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information