Transmittals stored in the Sent Items or Inbox registers can exported to HTML or PDF format as a single zip file.
To export transmittals:
Select one or more transmittals to be exported by ticking the select boxes against them.
If the InEight Document privacy statement appears, click Yes to continue with the download.
The selected transmittals are zipped on the InEight Document server and downloaded to your PC.
Save the zip file containing the exported transmittals to the appropriate location.
The zipping process may take a few minutes if many transmittals are selected.
A single transmittal being exported is not zipped.