Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
It is possible to import Contracts, Items, and Deliverable list items into the Vendor Data Module using Excel based templates.
To import items:
From within the Vendor Data Module, select More, then Import. This opens up the Import Vendor Data window.
Use the drop-down option on the right to select Contracts, Purchased Items or Deliverables as required.
Populate the data fields manually or select the Download Template button to download the excel-based template for each Vendor Data Element and populate as required.
Once the template has been populated, save it then select the Import Template button to import the updated template back into InEight Document.
Once complete, click Validate, then Save.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information