Select the Open File (DMS) button.
Choose the Documents folder. This provides the user with a list of all accessible PDF files and details, including the document number (Name field), date last modified and current revision/version (Version field).
In this example below, document A-R-101 is at version 02.01 (the first version of revision 2).
To open the required PDF file, select the document then click OK.