The review (Y/N) is triggered from the status assigned to the document. This determines if there is a requirement for a document to be reviewed. A document that requires review is defined as restrained and needs to be passed through a review workflow before it is released.
Summary: Define Review (Y/N) rules to indicate that a document must be reviewed (restrained) or not reviewed (unrestrained) when added to Document.