Lots Settings

Lots settings can be found by clicking the Lots tab in project settings.

Lots tab in project settings

See the table below for a description of each setting:

Setting

Description

Allow deleting Lots

Choose whether lots can be deleted.

Allow Lot originator company users to modify Lot security

Choose whether users of the originating company of the lot can modify lot security.

Default lot status

Choose the default status for lots.

Close-out all Lot items prior to changing the Lot status to “Close-out”

Choose whether the items of the lot need to be closed out before the lot status can be changed to closed out.

Module status to be closed prior to allowing item status to be changed to closed out Choose whether all items in a module must be closed before you can close a lot.
Sub lot status to be closed prior to allowing lot to be closed Choose whether to require all sublots be closed before the lot can be closed.
Allow item to be added or removed to a closed out lot Choose whether items can be added to a lot that has been closed out.
Allow editing Lot details when the status is closed out Choose whether lot details can be edited when the status is Closed out.