Mail settings can be found by clicking the Mail tab in project settings.
See the table below for a description of each setting:
|
Setting |
Description |
|---|---|
|
Enable use of Blind Copies (BCC) when sending mail |
Select whether blind carbon copies (BCC) can be used when sending mail. |
|
Enable the changing of the status of mail of any user within a company by a user of the same company with Company mail access |
This option enables a user with company access to mail to change the status of the mail of any user within the same company. |
|
Allow editing un-registered mails prior to processing |
This option enables unregistered mails to be edited prior to processing. |
|
Allow removing allocated mails from Folders/Sections |
This option allows allocated mail to be removed from folders/sections. |
|
Open mail detail view after sending mail |
Select this option to automatically display sent mail details after sending the mail. |
|
Setting |
Description |
|---|---|
|
Allow cancellation of mails by
|
Use this option to control who can cancel mail. The options are administrators, company users and senders. |
|
Contract turnaround period |
Define the contract turn around period by days. This will be able to be determined for each mail type when configuring the mail workflow. |