Defining Quick Links

The quick links widget on the Dashboard displays a list of links to external sites and is visible to all users if there is at least one link defined.

To add quick links:

  1. Click the cogwheel icon and select Admin.
    Select Admin from Cogwheel icon settings

  2. Select Configuration tables and select Quick Links from the drop-down menu.
    Quick Links selected in dropdown from Configuration tables panel

  3. Click the plus icon.

  4. Enter in the details for the new quick link.

    • URL: The URL for the quick link.

    • Link Text: The text that the quick link will display.

    Enter URL and Link Text in New Quick Links panel

  5. Click Save.