Introduction to Bluebeam Integration

This guide covers the setup and functionality of InEight Document’s Bluebeam Integration.

Business Process Overview

Bluebeam is an industry standard like Adobe Acrobat Pro and collaboration tool used to assist with the creation, editing and annotation of smart PDF files. InEight Document’s integration tool provides a seamless experience between the document control and review functionality in Document and Bluebeam’s PDF management capabilities.

There are 2 options for using Bluebeam:

  • Bluebeam RevU – Lets you make ad-hoc markup and change the document version rather than changing the entire revision of the document.

  • Bluebeam Studio – Lets you use InEight Document’s Review & Approval System i

 

Requirements

To start Bluebeam functionality in Document, work with your Project Delivery consultant to enable the following on relevant projects.

Function / Items Required

Purpose

Responsible Party

Bluebeam

Bluebeam software installed on required PC

Customer

Versioning (optional)

A customization enabling multiple versions per document revision. It is only required when using Bluebeam RevU

InEight

Single Sign On (Optional)

To facilitate document authentication between InEight Document and Bluebeam

InEight / Client

Default

Document

Attributes

A set of default mandatory document attributes should be defined to generate a History

Document Defaults i.e., Discipline, Area, Revision, Status and Type

InEight / Client

Bluebeam Studio Session Link

Bluebeam Studio Session link in Project Setting should be enabled in the relevant project.

InEight

Licenses

A Core or Complete license type is required when using Bluebeam Studio.

1. Service Account –  To facilitate the bridge between InEight Document and Bluebeam, this service account cannot initiate any documents. For example, bbintegration@ineight.com.

2. Review Initiator

Each Review initiator must have a Core or Complete Bluebeam license. 

A minimum of two licenses are required. The review initiator and the service account cannot be the same.

Client