Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
Adding a drawing to an Inspection List item allows the defect inspector to further clarify the exact location of the defect. For example, a floor plan may be added as an Inspection List drawing. When capturing the defect location, pins can be placed on the drawing to pinpoint where the defect is located, in relation to the floorplan.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information