Should any changes need to be made to any item within the Inspection List, this can be achieved following the steps below.
Within the Project Inspection List, select the item that is to be edited and right-click on it. This will display a number of options.
From the selection, click Edit (or use the toolbar above).
This will open the Edit screen where the current details will be displayed and editable. The only field that cannot be edited is the parent item (Apartment #1 in the example below).
Once the changes are made, click Save. The changes will then be applied to the Inspection List item.